• Banner

Exhaust TURBO KIT TK MAXI SCOOTER CSR MAX and MTR MAXI 250
  • Exhaust TURBO KIT TK MAXI SCOOTER CSR MAX and MTR MAXI 250

Exhaust TURBO KIT TK MAXI SCOOTER KYMCO K-XCT 300 from 2013

M4T122-N

An exhaust high quality, ideal to improve performance, make a nice noise and have a look at the top of your MAXI SCOOTER KYMCO K-XCT 300 from 2013.

Catalysis
€266.66
Quantity
Shipping in 7 to 20 days, factory manufacturing on demand!

Description

This is version MAXI SCOOTER lines in TURBOKIT for MAXI SCOOTER KYMCO K-XCT 300 4T from 2013 until today. This line is more affordable than the model OVAL H2 because it lacks carbon fiber at the tip and it has a more simplistic design! This line is nevertheless just as powerful, it is a full-line stainless steel (not rust) for Nepas demmander maintenance and provide more weight, his silent is it made of aluminum and stainless steel! This line comes with a DB KILLER is a small room that hides the noise and makes the quieter line, you can, when you feel more sensation and noise, remove the DB KILLER very simply! Side look, this line throws up with a design is sober and sports. The expected performance gain is 5 to 8%!

 

courbe puissance couple pot tk maxi scooter kymco 300 k-xct

Know that TK aka TURBO KIT SL is a Spanish manufacturer of exhaust since 1966. Although not widespread in France, Belgium and Luxembourg because of the relatively high price of products is a well known brand all products are tested on test bench for maximum performance, the materials used are European and manufacturing techniques too, which makes quality material!

Product Details
M4T122-N
New product

Specific References

ean13
8434734087921
16 other products in the same category:

Reference: M4T125-N

TK (TURBO KIT)

Exhaust TURBO KIT TK MAXI SCOOTER KYMCO PEOPLE S 250

An exhaust high quality, ideal to improve performance, make a nice noise and have a look at the top of your MAXI SCOOTER KYMCO PEOPLE S 250

Price €266.66
Shipping in 7 to 20 days, factory manufacturing on demand!
More
Shipping in 7 to 20 days, factory manufacturing on demand!